The points should be noted during the operation of the boom crane

As a common crane equipment, the cantilever crane must have a strict posture and careful observation during use to avoid accidents and reduce costs. electric cable hoist manufacturer Therefore, the following points should be noted during the operation of the boom crane:

1.Sometimes in order to protect the equipment on the cantilever crane from corrosion, it is necessary to periodically accumulate the polymer on the track and apply some anti-rust oil. The operator of the jib crane should strictly abide by the operating procedures. No-load operation should be carried out before each use of the cantilever crane, and it is checked whether the rotation, operation, lifting, limit and other mechanisms are normal. If an abnormality is found, the machine should be shut down for inspection before it can be used.

2.In the cantilever crane, it is not allowed to tilt and lift heavy objects. It is forbidden to use the hook to drag heavy objects along the ground or forcibly lift the buried heavy objects. It is also not allowed to use the local swivel arm to drag or hit the work.

3.The bumper or baffle at both ends of the cantilever I rail is used only for unrestricted positions. It is not allowed to be used as a normal parking method during normal operation and is not suitable for frequent collisions.overhead crane supplier

Also in the jib crane, after the operation is completed, the weight should be removed to avoid deformation of the mechanism for long-term suspension. In addition, the following stations are strictly forbidden during operation and some devices are installed to avoid accidents during construction.

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *